Feasibility Analysis

What is Feasibility Analysis??

  • An analysisand evaluation of a proposed project to determine if it (1) is technically feasible, (2) is feasible within the estimated cost, and (3) will be profitable for Organization.
  • Feasibility analysis guides the organization in determining whether to proceed with the project.
  • Feasibility analysis also identifies the important risks associated with the project that must be managed if the project is approved.
Feasibility Analysis

Types in Feasibility: As with the system request, each organization has its own process and format for the feasibility analysis, but most include techniques to assess three areas:

  • Technical Feasibility,
  • Economic Feasibility, and
  • Organizational Feasibility

Technical Feasibility?

  • Technical Feasibility: Can We Build It?
  • Familiarity with application: Less familiarity generates more risk.
  • Familiarity with technology: Less familiarity generates more risk.
  • Project size: Large projects have more risk.
  • Compatibility: The harder it is to integrate the system with the company’s existing technology, the higher the risk will be.

Economic Feasibility

  • Economic Feasibility: Should We Build It?
  • Development costs
  • Annual operating costs
  • Annual benefits (cost savings and/or increased revenues)
  • Intangible benefits and costs

Organizational Feasibility

  • Organizational Feasibility: If We Build It, Will They Come?
  • Project champion(s)
  • Senior management
  • Users
  • Other stakeholders
  • Is the project strategically aligned with the business?
FA

Technical Feasibility

  • The first technique in the feasibility analysis is to assess the technical feasibility of the project, the extent to which the system can be successfully designed, developed, and installed by the IT group.
  • Technical feasibility analysis is, in essence, a technical risk analysis that strives to answer the question: “ Can we build it?”

Familiarity with the application

  • First and foremost is the users’ and analysts’ familiarity with the application.
  • When analysts are unfamiliar with the business application area, they have a greater chance of misunderstanding the users or missing opportunities for improvement.
  • The risks increase dramatically when the users themselves are less familiar with an application.
  • When a system will use technology that has not been used before within the organization, there is a greater chance that problems and delays will occur because of the need to learn how to use the technology.
  • Risk increases dramatically when the technology itself is new.

Project size

  • Project size is an important consideration, whether measured as the number of people on the development team, the length of time it will take to complete the project, or the number of distinct features in the system.
  • Larger projects present more risk, because they are more complicated to manage and because there is a greater chance that some important system requirements will be overlooked or misunderstood.

Compatibility

  • Systems rarely are built in a vacuum—they are built in organizations that have numerous systems already in place.
  • New technology and applications need to be able to integrate with the existing environment for many reasons.
  • They may rely on data from existing systems, they may produce data that feed other applications, and they may have to use the company’s existing communications infrastructure.
  • A new system has little value if it does not use customer data found across the organization in existing sales systems, marketing applications, and customer service systems.

Economic Feasibility

  • Economic feasibility analysis also called a cost–benefit analysis.
  • This attempts to answer the question “Should we build the system?”
  • Economic feasibility is determined by identifying costs and benefits associated with the system, assigning values to them, calculating future cash flows, and measuring the financial worthiness of the project.
  • Keep in mind that organizations have limited capital resources and multiple projects will be competing for funding.

Steps to Conduct an Economic Feasibility Analysis

  1. Identify Costs and Benefits
    • List the tangible costs and benefits for the project.
    • Include both one-time and recurring costs.
  1. Assign Values to Costs and Benefits
  • Work with business users and IT professionals to create numbers for each of the costs and benefits.
  • Even intangibles should be valued if at all possible.
  1. Determine Cash Flow
  • Forecast what the costs and benefits will be over a certain period, usually, three to five years.
  • Apply a growth rate to the values, if necessary.
  1. Assess Project’s Economic Value
  • Evaluate the project’s expected returns in comparison to its costs.
  • Use one or more of the following evaluation techniques:
  1. Determine Cash Flow
  • Forecast what the costs and benefits will be over a certain period, usually, three to five years.
  • Apply a growth rate to the values, if necessary.
  1. Assess Project’s Economic Value
  • Evaluate the project’s expected returns in comparison to its costs.
  • Use one or more of the following evaluation techniques:

Assess Project’s Economic Value

  1. Return on Investment (ROI)
    • Calculate the rate of return earned on the money invested in the project, using the ROI formula.
  2. Break-Even Point (BEP)
    • Find the year in which the cumulative project benefits exceed cumulative project costs.
    • Apply the breakeven formula, using figures for that year.
    • This calculation measures how long it will take for the system to produce benefits that cover its costs.

iii.   Net Present Value (NPV)

  • Restate all costs and benefits in today’s dollar terms(present value), using an appropriate discount rate.
  • Determine whether the total present value of benefits is greater than or less than the total present value of costs.
dfd

Identify Costs and Benefits

  • The systems analyst’s first task when developing an economic feasibility analysis is to identify the kinds of costs and benefits the system will have and list them.
  • The costs and benefits can be broken down into four categories:
    • (1) Development Costs,
    • (2) Operational Costs,
    • (3) Tangible Benefits, and
    • (4) Intangible Benefits.

Development costs

  • Development costs are those tangible expenses that are incurred during the creation of the system, such as salaries for the project team, hardware and software expenses, consultant fees, training, and office space and equipment.
  • Development costs are usually thought of as one-time costs.

Operational costs

  • Operational costs are those tangible costs that are required to operate the system, such as the salaries for operations staff, software licensing fees, equipment upgrades, and communications charges.
  • Operational costs are usually thought of as ongoing costs

Tangible benefits

  • Tangible benefits include revenue that the system enables the organization to collect, such as increased sales.

Tangible benefits include revenue that the system enables the organization to collect, such as increased sales.

dfd

Assign Values to Costs and Benefits

  • Once the types of costs and benefits have been identified, the analyst needs to assign specific BDT values to them.
  • This may seem impossible—How can someone quantify costs and benefits that haven’t happened yet? And how can those predictions be realistic?
  • The most effective strategy for estimating costs and benefits is to rely on the people who have the best understanding of them.

Cash Flow Analysis and Measures

  • IT projects commonly involve an initial investment that produces a stream of benefits over time, along with some ongoing support costs.
  • Cash flows, both inflows and outflows, are estimated over some future period.
  • In this simple example, a system is developed in Year 0 (the current year) costing $100,000. Once the system is operational, benefits and on-going costs are projected over three years.
RV

Return on Investment(ROI)

  • The return on investment (ROI) is a calculation that measures the average rate of return earned on the money invested in the project.
  • ROI is a simple calculation that divides the project’s net benefits (total benefits – total costs) by the total costs.
RV

A high ROI suggests that the project’s benefits far outweigh the project’s cost, although exactly what constitutes a “high” ROI is unclear.

Break-Even Point

  • The break-even point  (also called the payback method ) is defined as the number of years it takes a firm to recover its original investment in the project from net cash flows.
RV
  • In this example, the project’s cumulative cash flow figure becomes positive during Year 3, so the initial investment is “paid back” over two years plus some fraction of the year 3.

 

dfd

Discounted Cash Flow Technique

  • Discounted cash flows are used to compare the present value of all cash inflows and outflows for the project in today’s BDT terms.
  • A BDT received in the future is worth less than a BDT received today, since you forgo that potential return.
SDLC

Discounted Cash Flow Projection

rv

Net Present Value (NPV)

  • The NPV is simply the difference between the total present value of the benefits and the total present value of the costs.
  • As long as the NPV is greater than zero, the project is considered economically acceptable.
dfd

Net Present Value (NPV)

  • Unfortunately for this project, the NPV is less than zero, indicating that for a required rate of return of 10%, this project should not be accepted.
  • The required rate of return would have to be something less than 6.65% before this project returns a positive NPV.

Organizational Feasibility

  • The final technique used for feasibility analysis is to assess the organizational feasibility of the system: how well the system ultimately will be accepted by its users and incorporated into the ongoing operations of the organization.
  • One way to assess the organizational feasibility of the project is to understand how well the goals of the project align with business objectives.
  • A second way to assess organizational feasibility is to conduct a stakeholder analysis.
  • A stakeholder is a person, group, or organization that can affect (or can be affected by) a new system.
  • The most important stakeholders in the introduction of a new system are the project champion, system users, and organizational management.
dfd

Try yourself

  1. Think about the idea that you developed to improve your university course enrollment process.

QUESTIONS :

  1. List three things that influence the technical feasibility of the system.
  2. List three things that influence the economic feasibility of the system.
  3. List three things that influence the organizational feasibility of the system.
  4. How can you learn more about the issues that affect the three kinds of feasibility?

Frequency Word for IELTS Listening

Frequency Word for IELTS Listening School a. Library  WordSentence1. Shelf 2. Librarian 3. The stacks 4. Return 5. Fine 6. Magazine 7. Copier  8. Overdue  9. Reading room  10. Reference...

Chapter 5: System request on SDLC

System Request In most organizations, project initiation begins by preparing a  system request. A  system request is a document that describes the business reasons for building a system and the value that the system is expected to provide.The project sponsor...

Chapter 4: SDLC design Phase

SDLC design Phase DFD (Design Analysis)Architectural DesignUI DesignDatabase DesignProgram DesignArchitectural design (logical)Network designClient –server designClient designServer designCloud ComputingDatabase designER diagramRelational diagramDDL (not...

Chapter 3: SDLC and its Life cycle Phases.

What is SDLC? The systems development life cycle (SDLC), also referred to as the application development life-cycle, is a term used in systems engineering, information systems and software engineering to describe a process for planning, creating, testing, and...

You may find interest following article

Frequency Word for IELTS Listening

Frequency Word for IELTS Listening School a. Library  WordSentence1. Shelf 2. Librarian 3. The stacks 4. Return 5. Fine 6. Magazine 7. Copier  8. Overdue  9. Reading room  10. Reference room  11. Periodical room  12. Study lounge  13. Catalogue  14....

Chapter 8: Gantt chart Project Development in SDLC

Gantt chart Project DevelopmentSchedule (project management) The project scheduleis the tool that communicates what work needs to be performed, which resources of the organization will perform the work and the timeframes in which that work needs to be performed. The project scheduleshould reflect all of the work associated with delivering the project on time....

Chapter 6: Data Flow Diagram in Software Development Life Cycle.

Data Flow Diagram What is DFD? A data flow diagram (DFD) is a graphical representation of the "flow" of data through an information system, modelling its process aspects.A DFD is often used as a preliminary step to create an overview of the system, which can later be elaborated.Show users how data moves between different processes in a system. Figure 1: DFD Symbols...

Chapter 5: System request on SDLC

System Request In most organizations, project initiation begins by preparing a  system request. A  system request is a document that describes the business reasons for building a system and the value that the system is expected to provide.The project sponsor usually completes this form as part of a formal system project selection process within the...

Chapter 4: SDLC design Phase

SDLC design Phase DFD (Design Analysis)Architectural DesignUI DesignDatabase DesignProgram DesignArchitectural design (logical)Network designClient –server designClient designServer designCloud ComputingDatabase designER diagramRelational diagramDDL (not now..!!)Program design (physical)Investigating the hardware/software platformPhysical DFDData storageData...

Chapter 3: SDLC and its Life cycle Phases.

What is SDLC? The systems development life cycle (SDLC), also referred to as the application development life-cycle, is a term used in systems engineering, information systems and software engineering to describe a process for planning, creating, testing, and deploying an information system. Career Paths for System Developers Systems Development Life Cycle Building...

Chapter 2: SDLC Key Features For SYSTEMS ANALYST.

Once upon a time, software development consisted of a programmer writing code to solve a problem or automate a procedure. Nowadays, systems are so big and complex that teams of architects, analysts, programmers, testers and users must work together to create the millions of lines of custom-written code that drive our enterprises.To manage this, a number of system...

Chapter 1: System analysis and Design Overview.

System analysis, a method of studying a system by examining its component parts and their interactions. •It provides a framework in which judgments of the experts in different fields can be combined to determine what must be done, and what is the best way to accomplish it in light of current and future needs.  •The system analyst (usually a software engineer or...

Chapter 4: Concept Of Sampling, Quantization And Resolutions

Concept Of Sampling, Quantization And Resolutions Conversion of analog signal to digital signal: The output of most of the image sensors is an analog signal, and we can not apply digital processing on it because we can not store it. We can not store it because it requires infinite memory to store a signal that can have infinite values. So we have to convert an...

Chapter 3: Images and Conversions in Digital Image Process

Images And Conversions There are many type of images, and we will look in detail about different types of images, and the color distribution in them. The binary image The binary image as it name states, contain only two pixel values. 0 and 1. In our previous tutorial of bits per pixel, we have explained this in detail about the representation of pixel values to...

Chapter 2: Concept of Pixel in Digital Image Process

Concept of Pixel Pixel Pixel is the smallest element of an image. Each pixel correspond to any one value. In an 8-bit gray scale image, the value of the pixel between 0 and 255. The value of a pixel at any point correspond to the intensity of the light photons striking at that point. Each pixel store a value proportional to the light intensity at that particular...

Part 6: IELTS Academic Writing Task 1 For Diagram/Graph Vocabulary

Vocabulary to show the sequence: You must write a summary of at least 150 words in response to a specific graph (bar, line, or pie graph), table, chart, or procedure in Writing Task 1 of the IELTS Academic test (how something works, how something is done). This job assesses your ability to choose and report the most important aspects, describe and compare data,...

Part 5: IELTS Academic Writing Task 1 Formal and Informal expressions.

Formal and Informal expressions and words: You must write a summary of at least 150 words in response to a specific graph (bar, line, or pie graph), table, chart, or procedure on the IELTS Academic test (how something works, how something is done). Few more informal expressions with their formal versions are given below. Since IELTS is a formal test, your writing...

Part 4: IELTS Academic Writing Task 1 For Graph Comparison Vocabulary

Vocabulary to represent comparison in graphs: Type Word(s) should be used Similar about / almost / nearly / roughly / approximately / around / just about / very nearly / Just over just above / just over / just bigger / just beyond / just across Just short just below / just beneath / just sort / just under / just a little Much more well above / well above / well...

Part 3: IELTS Academic Writing Task 1 For Vocabulary Date month etc.

IELTS Academic Writing Task 1 For Vocabulary Date month From 1990 to 2000, Commencing from 1980, Between 1995 and 2005, After 2012. By 1995, In 1998, In February, Over the period, During the period, During 2011. In the first half of the year, For the first quarter, The last quarter of the year, During the first decade. In the 80s, In the 1980s, During the next 6...

Part 2: IELTS Academic Writing Task 1 For Report Writing

The structure of the IELTS Academic Writing Task 1 (Report Writing): Introduction: Introduction (never copy word for word from the question) + Overview/ General trend (what the diagrams indicate at a first glance). Reporting Details: Main features in the Details + Comparison and Contrast of the data. (Do not give all the figures.) + Most striking features of the...

Part 1: IELTS Writing Task 1 For Vocabulary

Vocabulary For Academic IELTS Writing Task 1 (part 1)  Academic IELTS Writing Task 1 question requires you to use several vocabularies to present the data given in a pie/ bar/ line/ mixed graph or to describe a process or a flow chart. Being able to use appropriate vocabularies, presenting the main trend, comparing & contrasting data and presenting thei logical...

Chapter 1: Introduction To Digital Image Processing (DIP)

Introduction to DIP Signal processing is a discipline in electrical engineering and in mathematics that deals with analysis and processing of analog and digital signals , and deals with storing , filtering , and other operations on signals. These signals include transmission signals , sound or voice signals , image signals , and other signals etc. Out of all these...

Part 10: DC – Network Addressing and Network Layer Routing

DC - Network Addressing Layer 3 network addressing is one of the major tasks of Network Layer. Network Addresses are always logical i.e. these are software based addresses which can be changed by appropriate configurations. A network address always points to host / node / server or it can represent a whole network. Network address is always configured on network...

Part 9: Error Detection and Correction in Communication

DC - Error Detection & Correction There are many reasons such as noise, cross-talk etc., which may help data to get corrupted during transmission. The upper layers work on some generalized view of network architecture and are not aware of actual hardware data processing. Hence, the upper layers expect error-free transmission between the systems. Most of the...